Rugged Solutions 616-951-5338 info@getruggedsolutions.com
Service · Legacy system modernization

Running a key line on a 20-year-old system? Upgrade it before it decides for you.

If a product your company depends on runs through a controller, tester or WCS that is 20+ years old, the parts are getting hard to find and the people who wrote it are gone, that system is a single point of failure. We replace it — software, controls and integrations — with a short, planned cutover.

Get a legacy system review See a 3-day WCS cutover

Signs it's time

Spare parts from eBay

Controllers, I/O cards or PCs are discontinued, and you're buying used spares.

Nobody can change it

The original supplier is gone, acquired or no longer supports your version, and the source code is missing.

Windows XP on the floor

HMIs and servers on operating systems that get no security patches and can't be put on a modern network.

No data comes out

The system works, but tells you nothing about throughput, faults or test results.

One person knows it

A single technician keeps it alive, and they're close to retiring.

It blocks everything else

New ERP, new equipment or more volume can't happen until the old system is replaced.

What we replace

3 daysComplete WCS rewrite, installed
1970sUL962A tester we replaced
1990sDyno control system modernized
20 yrsSupporting one client's WCS

How we keep downtime short

  • Capture what the old system really does — I/O, timing, messages, edge cases — before touching anything.
  • Build alongside: the new system is developed and tested against the existing equipment and data while production keeps running.
  • Cut over in a planned window, with the old system ready to switch back.
  • Close the security gap while we're there: supported operating systems, segmented networks, accounts and backups.
  • Hand over documented source code you own.
Chassis dynamometer road-load derivation screen
Modernized chassis dyno control — the original was designed in the 1990s.
3-DAY CUTOVER Complete WCS rewrite · no problems since

“Rugged Solutions has worked on additions and maintenance of our software for 20 years. The last upgrade was a complete rewrite of our Warehouse Control System and [it was installed] in three days! No problems since.”

Kye K. IT & Database Admin, Distribution for Pro Hardware

Related

Tell us what's running on borrowed time. We'll tell you what replacing it involves.

Book a legacy review

Questions

Can you replace a WCS or control system originally supplied by another company?
Yes. We replace and support software from previous suppliers, working with the existing cranes, conveyors and machines, and give you documented source code you own.
How long is production down during a legacy upgrade?
We build and test the new system alongside the old one, so the cutover is a planned window. One complete WCS rewrite was installed in three days.
Do we need the original source code?
It helps, but it isn't required. We can reconstruct behavior from the running system, its I/O, messages and logs.
Does modernization improve security?
Usually a lot. Old systems often run on unsupported operating systems on flat networks; a replacement moves them to patched platforms with segmented networks, named accounts and backups.