Updated 2026-11-25 · by Tom Cruttenden, Rugged Solutions
What we work on
PLCs
Allen-Bradley ControlLogix and CompactLogix, older MicroLogix, SLC 500 and PLC-5, Phoenix Contact PLCnext, AutomationDirect CLICK, Productivity and Do-more, CODESYS-based controllers, OpenPLC and others.
Robots
Fanuc, Yaskawa Motoman, Denso, Epson, KUKA, ABB and others: robot programs, PLC handshakes, safety interlocks and recovery after faults.
Vision
Keyence, Banner, Cognex and other cameras and smart sensors: inspections that pass bad parts or fail good ones, lighting and fixturing, and results tied to the part serial.
Aging hardware and old networks
A lot of good machines run on networks and parts that are no longer sold. We keep them running, bridge them to modern systems, or replace them in planned steps:
- DeviceNet and Remote I/O with failing scanners, taps and nodes
- Data Highway Plus (“blue hose”) linking old PLCs and panels
- Modbus RTU and Modbus TCP devices, drives and meters
- Old servo drives and motion controllers with no spares left
- Discontinued I/O cards, HMIs and panel PCs on unsupported operating systems
Cells that never worked right
Some cells were never right from day one: the robot waits on the PLC, the camera rejects good parts, a fault needs someone to walk over and reset it every shift. We find the cause in the program, the handshake, the timing or the hardware, and fix it rather than living with it.
“I personally have learned a large amount from Tom [in a wide range of applications from automation & robotics to electronics & programming].”
Get the data out: Ignition, SCADA and MES
- Read counts, states, faults and cycle times from the PLCs, robots and cameras you already have
- Feed it to Ignition, another SCADA, an MES or straight into OEE dashboards
- Add the tags, handshakes and buffers the old program never had, without changing how the machine runs
What is MES?
A manufacturing execution system (MES) runs and records production on the plant floor. It sits between the ERP, which plans orders, inventory and money, and the machines (PLCs, robots, testers) that do the work.
- Work orders: what to make, on which line, in what order
- Traceability: which parts were made when, on which machine, from which material
- Quality: test and inspection results recorded against each part
- Performance: downtime, scrap and OEE by machine and shift
In the ISA-95 model MES is level 3: the ERP plans the work, the MES executes and records it, and the controls do it. Many plants don't need a big MES product; connecting the machines to a SCADA such as Ignition, or to dashboards and the ERP, covers most of it.
Cell holding back the line? Let's look at it.
Book 15 minutes